The Practitioner's Manual for Cost and Schedule Performance.
See the slip in the data before it reaches the finish date.

Earned Value & Earned Time — Hardcover, 146 pages, full-color interior, glossy case wrap. $99.

Bonus: every hardcover order includes the PDF edition free — email your Lulu receipt to info@p6master.com and we’ll send your download link.
Earned value the way it works inside Primavera P6 — then Earned Schedule and path-based Earned Time Management, with every method worked on six fictional sandbox projects. No theory without application.
Control accounts, cost loading, earning rules, the right P6 columns — and the formulas the internet gets wrong.
EAC ranges, TCPI, and variance analysis reports (VARs) written to trigger decisions, not decorate status meetings.
Why cost SPI drifts to 1.0 on late projects — and ETM measured by task, lag, subnet and path, with forecasts and float erosion.
Monte Carlo calibrated with SPI(ETM), plus the DCMA, BEI and out-of-sequence checks that expose green numbers built on a broken schedule.
Executive dashboards with full DAX measures for Power BI and Tableau, and AI workflows with a prompt library and guardrails.
Playbooks for data centers, federal buildings, rail, aviation, water and IT — plus a formula sheet, glossary, four templates and two practice workbenches with a full answer key.
Buyer bonuses: variance analysis report (VAR) template (Word) and ETM path worksheet (Excel, with formulas) — included free with the full edition.
A worked cost-at-completion range, Earned Time measured path by path, the EVM vs. ES vs. ETM comparison — plus float erosion, the risk-adjusted forecast and the executive page.
Earned time by path, so the finish date stops being a surprise.
EAC ranges, TCPI and VARs your reviewers can defend.
One honest read on cost and time — before either becomes a crisis.
How to read a contractor's indices — and what to ask next.
Worked examples and workbenches that turn exam topics into reflexes.
The cover, copyright, contents, foreword and the opening of Chapter 13 — Earned Time Management. No email required.
Download Preview (PDF)The Earned Time path worksheet from the book's template pack (Excel, with formulas) — free until Nov 13, then a buyer-only bonus.
Download Worksheet (Excel)
Calculate EVM, Earned Schedule and path-based Earned Time from your P6 update — the AI schedule-analytics platform from the same team.
Questions? info@contrlsiq.com
Delay and earned value are the same conversation from two sides. Smart EOT & Delay Management covers TIA, forensic analysis and schedule risk; Earned Value & Earned Time covers cost and time performance. Get both together and save $29.
The complete 147-page First Edition PDF: 25 chapters in 8 parts, 5 appendices, a formula sheet and glossary, two practice workbenches with a full answer key — plus two buyer bonuses, the VAR template (Word) and the ETM path worksheet (Excel). Single-user licence — your email is stamped on every page.
No. The methods apply to every schedule-driven industry, with dedicated playbooks for data centers, federal buildings, rail, aviation, water and IT.
The preview is 11 pages — cover, copyright, contents, foreword and the opening of Chapter 13. The full edition is the complete 147-page manual with all 25 chapters, templates and workbenches.
One manual. EVM, Earned Schedule and Earned Time — worked end to end, in P6.
Get Earned Value & Earned Time — $99Instant PDF download · Secure checkout via Stripe · From P6 Project Controls
© 2026 P6 Project Controls. Single-user licence. Digital product; no refunds after download.