Who Needs Independent Schedule Review
Owners, construction managers, and program management firms need independent schedule review capability for every contractor submission — baseline schedules, monthly updates, recovery schedules, and time extension requests. Without qualified review, non-compliant schedules get approved, unrealistic timelines go unchallenged, and delay responsibility becomes impossible to establish when disputes arise.
We also support contractors who want their own internal QA/QC before submitting to the owner. Catching and fixing issues before submission eliminates rejection cycles and preserves your professional reputation.
What We Evaluate
Logic Integrity
We examine every relationship in the network for technical accuracy. Are the predecessors and successors logically correct? Are there open-ended activities that create scheduling gaps? Are relationship types (FS, FF, SS, SF) used appropriately, or are they masking sequencing problems? We map the logic network and identify activities that are logically disconnected or that create artificial float through improper relationship types.
Duration Reasonableness
Activities with durations that are too short won't support actual crew productivity. Activities that are too long hide work sequence detail and reduce schedule usefulness. We evaluate durations against industry production rates, historical data, and crew-size assumptions to flag outliers that indicate either over-aggregation or unrealistic planning.
Constraint Analysis
Hard constraints (Must Start On, Must Finish On) override network logic and mask the true critical path. We evaluate every constraint in the schedule — its type, its justification, and whether it's appropriate given the project circumstances. Excessive hard constraints are one of the most common indicators of schedule manipulation.
Critical Path Validation
Is the critical path real? Does it represent the actual longest path through the network, or is it an artifact of constraints, open ends, or resource conflicts? We trace the critical path from project start to contract completion, verify that every critical activity has valid logic, and confirm that the critical path aligns with the physical construction sequence described in the narrative.
Specification Compliance
We verify line-by-line compliance with the contract scheduling specification, including activity coding requirements, calendar configuration, cost loading, resource loading, milestone definitions, submission format, and narrative content requirements.
Our Review Deliverables
DCMA 14-Point Assessment
Full quantitative assessment against DCMA thresholds with pass/fail scoring for each metric and overall schedule health grade.
Findings Report
Detailed list of every issue identified — categorized as rejection-level, advisory, or informational — with specific activity IDs and recommended corrections.
Formal Review Memo
A professional memorandum summarizing the review findings, overall assessment, and recommendation (approve, conditionally approve, or reject with required corrections).
Compliance Matrix
A specification cross-reference showing compliance status for every scheduling requirement in the contract — verified against the submitted schedule.
Free first step: Use our Schedule Analyzer to run an instant automated health check on any XER or XML file. For a full expert review with formal memo and findings report, book a call to discuss your project.
Engagement Models
We structure schedule review engagements to fit how your organization manages projects. For owner-side clients, we can serve as your retained schedule reviewer on a per-submission or monthly retainer basis. For contractors, we provide pre-submission QA/QC as a one-time service or as part of an ongoing scheduling support relationship.
- Per-submission review — fixed fee for each baseline or update review, ideal for owners with periodic submission requirements
- Monthly retainer — ongoing schedule review support for programs with multiple active projects and regular submission cycles
- Pre-submission QA/QC — contractor-side review before owner submission to catch and fix issues proactively
- Litigation review — forensic-grade schedule evaluation for construction dispute proceedings
Ready to Resolve Your Scheduling Challenges?
Book a free 15-minute consultation with our certified scheduling team.
Book Your Call →Frequently Asked Questions
A standard baseline review (under 2,000 activities) is typically completed in 3-5 business days. Monthly update reviews are faster since the baseline has already been evaluated. Complex schedules or litigation-grade reviews may require 1-2 weeks.
Primavera P6 XER files are preferred. We also accept XML exports, Primavera Cloud exports, and Microsoft Project files. Along with the schedule file, we need the contract scheduling specification and any previous review correspondence.
Both. Every finding includes a specific recommendation for how to resolve the issue. We also include an overall recommendation (approve, conditionally approve, or reject) with clear rationale for the determination.
Yes. We support multi-project programs with standardized review templates, consistent evaluation criteria across all projects, and consolidated reporting at the program level. This is common in our federal program support engagements.