Schedule Review & QA/QC Services

You received a contractor schedule submission and need to know: is it compliant, is it realistic, and does it actually reflect how they plan to build? We provide the independent review that gives you a definitive answer.

Who Needs Independent Schedule Review

Owners, construction managers, and program management firms need independent schedule review capability for every contractor submission — baseline schedules, monthly updates, recovery schedules, and time extension requests. Without qualified review, non-compliant schedules get approved, unrealistic timelines go unchallenged, and delay responsibility becomes impossible to establish when disputes arise.

We also support contractors who want their own internal QA/QC before submitting to the owner. Catching and fixing issues before submission eliminates rejection cycles and preserves your professional reputation.

What We Evaluate

Logic Integrity

We examine every relationship in the network for technical accuracy. Are the predecessors and successors logically correct? Are there open-ended activities that create scheduling gaps? Are relationship types (FS, FF, SS, SF) used appropriately, or are they masking sequencing problems? We map the logic network and identify activities that are logically disconnected or that create artificial float through improper relationship types.

Duration Reasonableness

Activities with durations that are too short won't support actual crew productivity. Activities that are too long hide work sequence detail and reduce schedule usefulness. We evaluate durations against industry production rates, historical data, and crew-size assumptions to flag outliers that indicate either over-aggregation or unrealistic planning.

Constraint Analysis

Hard constraints (Must Start On, Must Finish On) override network logic and mask the true critical path. We evaluate every constraint in the schedule — its type, its justification, and whether it's appropriate given the project circumstances. Excessive hard constraints are one of the most common indicators of schedule manipulation.

Critical Path Validation

Is the critical path real? Does it represent the actual longest path through the network, or is it an artifact of constraints, open ends, or resource conflicts? We trace the critical path from project start to contract completion, verify that every critical activity has valid logic, and confirm that the critical path aligns with the physical construction sequence described in the narrative.

Specification Compliance

We verify line-by-line compliance with the contract scheduling specification, including activity coding requirements, calendar configuration, cost loading, resource loading, milestone definitions, submission format, and narrative content requirements.

Our Review Deliverables

01

DCMA 14-Point Assessment

Full quantitative assessment against DCMA thresholds with pass/fail scoring for each metric and overall schedule health grade.

02

Findings Report

Detailed list of every issue identified — categorized as rejection-level, advisory, or informational — with specific activity IDs and recommended corrections.

03

Formal Review Memo

A professional memorandum summarizing the review findings, overall assessment, and recommendation (approve, conditionally approve, or reject with required corrections).

04

Compliance Matrix

A specification cross-reference showing compliance status for every scheduling requirement in the contract — verified against the submitted schedule.

Free first step: Use our Schedule Analyzer to run an instant automated health check on any XER or XML file. For a full expert review with formal memo and findings report, book a call to discuss your project.

Engagement Models

We structure schedule review engagements to fit how your organization manages projects. For owner-side clients, we can serve as your retained schedule reviewer on a per-submission or monthly retainer basis. For contractors, we provide pre-submission QA/QC as a one-time service or as part of an ongoing scheduling support relationship.

Ready to Resolve Your Scheduling Challenges?

Book a free 15-minute consultation with our certified scheduling team.

Book Your Call →

Frequently Asked Questions

How long does a schedule review take?

A standard baseline review (under 2,000 activities) is typically completed in 3-5 business days. Monthly update reviews are faster since the baseline has already been evaluated. Complex schedules or litigation-grade reviews may require 1-2 weeks.

What format do you need the schedule in?

Primavera P6 XER files are preferred. We also accept XML exports, Primavera Cloud exports, and Microsoft Project files. Along with the schedule file, we need the contract scheduling specification and any previous review correspondence.

Do you provide recommendations or just findings?

Both. Every finding includes a specific recommendation for how to resolve the issue. We also include an overall recommendation (approve, conditionally approve, or reject) with clear rationale for the determination.

Can you review schedules for multiple projects on a program?

Yes. We support multi-project programs with standardized review templates, consistent evaluation criteria across all projects, and consolidated reporting at the program level. This is common in our federal program support engagements.